Thursday 25 June 2020

Wellington Water Resilience System Explainer.

Wellington Water infrastructure resilience project. Completed as part of a wider education campaign on what to do if there is ever an earthquake in the Wellington region and how Wellington Water is preparing for when one occurs.

I had lots of fun animating on this project as there was allot of character animation to do, something which doesn't happen everyday in my current line of work.

Animation and Post completed my myself, Pre production completed by PORT Group Ltd.


NZTA Explainer.

Allot of the work I have been doing lately is for the NZTA (New Zealand Transport Authority). Animation and Post-production by myself, Pre-production and design completed by PORT Group Ltd.



Friday 19 June 2020

Wow, where did 4 years go?

Wow, where did those 4 years go?

Turns out starting a family really does mean you have almost no time for extra stuff. So what have I been up to? Well allot actually, I have been continuing to get freelance work and have completed several projects that I want to share as I find that they have been released to the general Joe public.

Here is a project from last year for the Department of Conservation. All of the design and  pre-production work was done by the amazing people at Port Group.

Take Care

G.